DXH Container completed a 218-unit modular building project in Indonesia between October 2023 and January 2024. Developed for a mining and concrete batching operation, the project provides on-site worker accommodation, engineering and management offices, dining areas, and supporting camp facilities.

DXH Container supplied the modular buildings and provided on-site installation guidance. The project was planned as an integrated site compound rather than a collection of standalone container units, combining accommodation, administration, dining, utility, and recreation functions within one coordinated masterplan.

Project at a Glance

Item Details
Project Type Modular Mining Camp and Site Office Project
Location Indonesia
Project Timeline October 2023 to January 2024
Project Status Delivered and installation completed
Main Application Mining and Concrete Batching Project
Total Supply 218 Modular Building Units
Main Users Site Workers, Engineering Teams, Management and Project Personnel
Main Building Functions Dormitories, Site Offices, Canteens, Laboratory and Supporting Facilities
Structural System Weathering Steel Structure with Rock Wool Insulated Panels
Construction Method Factory-Manufactured Modular Construction

Project Background

Mining and concrete batching projects often require functional facilities to be established close to the operating area. In remote or developing project locations, conventional construction can require extensive on-site labor, material handling, civil coordination, and building work before accommodation and offices are ready for use.

For this Indonesia project, the client required a practical site compound to accommodate personnel and support day-to-day project operations. In addition to worker dormitories, the project needed administrative offices, dining facilities, laboratory space, utility areas, internal roads, and supporting infrastructure.

The objective was to reduce reliance on extensive conventional on-site building work while establishing a coordinated accommodation and site-office environment at a controlled project cost.

Prefab-Worker-Dormitory-for-Remote-Porject

Project Challenges

The project required coordinating multiple building functions within a single operational camp.

A large number of personnel required organized accommodation zones, while engineering, management, laboratory, dining, and utility functions needed to remain accessible within the same site. Constructing these facilities solely through conventional methods would require substantial site-based construction activities and coordination.

The project therefore required a modular solution that could support:

  • • High-capacity worker accommodation
  • • Dedicated offices for engineering and project management teams
  • • Dining and canteen facilities
  • • Laboratory and operational support areas
  • • Utility areas and service facilities
  • • Internal transportation, parking, and recreation spaces
  • • Practical installation coordination at the Indonesian project site

DXH Container's Modular Solution

Modular Building Units for Site Accommodation

DXH Container supplied a total of 218 modular building units for the project. The modular units were arranged as part of a planned workforce accommodation compound, rather than being installed as isolated buildings.

The site masterplan includes both single-story and two-story dormitory configurations. This arrangement supports organized accommodation zones while allowing the available site area to be used efficiently.

For mining, construction, industrial, and remote-workforce applications, modular accommodation can be configured to meet project requirements, including room layout, occupancy arrangement, insulation level, plumbing, electrical systems, and air-conditioning provisions.

Two-Story Modular Site Office

A two-story site office building was incorporated into the central area of the site plan. This facility provides a dedicated workspace for project management, engineering, administration, and related site operations.

Integrating the office within the same modular development allows accommodation and administration functions to be planned together. This can simplify site organization and improve access between residential and operational areas.

2-Story-Modular-Site-Office-for-Indonesia

Canteens, Laboratory, and Support Buildings

The overall site plan includes facilities that support daily camp operations, including:

  • • Two canteen and dining areas
  • • A laboratory building
  • • A guard room near the site entrance
  • • A reserved generator room
  • • Water towers and wells
  • • Septic tanks and wastewater-related facilities
  • • Parking areas and internal access roads
  • • A basketball court and recreation space
  • • Perimeter fencing and site access control

These facilities demonstrate how modular buildings can be incorporated into a broader workforce camp plan, combining living, working, dining, utility, and recreation requirements.

Modular-Mining-Camp-and-Site-Office-Site-Plan

The masterplan shows the functional layout of the 218-unit modular site camp for the Indonesia mining and concrete batching project. This planning approach is suitable for mining, construction, infrastructure, industrial, and concrete batching projects that require more than individual modular rooms. It provides a coordinated framework for developing a functional temporary or semi-permanent workforce accommodation and site office facility.

Weathering Steel Structure and Rock Wool Insulation

The modular buildings supplied for this project use a weathering-steel structural system with insulated rock wool panels.

The weathering steel structure forms the main building framework, while the rock wool insulation layer helps provide thermal insulation for worker accommodation, office, and supporting-facility applications.

Project installation shows the roof steel structure and rock wool insulation being installed during the on-site assembly phase. This reflects the modular construction process, in which major building components are manufactured and prepared before delivery to the project site.

After delivery, the installation process focuses on modular assembly, roof installation, building connections, and finishing work in accordance with the confirmed project scope and site arrangements.

Prefabricated-2-story-Workforce-Accommodation

From Factory Manufacturing to On-Site Installation

DXH Container manufactured and supplied the modular building components for the Indonesia project and provided on-site installation guidance.

Factory-manufactured modular construction allows major building elements to be prepared before arriving at the project location. At the site, work can focus on modular assembly, roof installation, utility connections, and finishing rather than constructing every building component from raw materials on-site.

For large workforce accommodation projects, this approach can help project teams coordinate accommodation, offices, dining facilities, and support buildings through a more standardized building system.

Project Result

Completed in January 2024, the Indonesia project delivered a 218-unit modular site compound for a mining and concrete batching operation.

The completed development combines worker dormitories, a two-story site office, canteens, a laboratory, utility facilities, access roads, parking areas, and recreation space in a coordinated plan.

The project shows how modular construction can be applied to large-scale workforce accommodation and support facilities. Instead of treating worker housing, offices, dining, and utility buildings as separate construction packages, the modular approach enabled these functions to be planned as part of one integrated site compound.

Modular-Camp-Canteen-Floor-Plan-Design

Why Choose DXH Container for Mining Camp Projects?

DXH Container provides factory-manufactured modular camp solutions for mining, construction, industrial, infrastructure, and remote-site applications.

For large workforce accommodation projects, DXH Container can support clients with:

  • • Modular dormitories and worker accommodation buildings
  • • Modular site offices and management buildings
  • • Canteens, dining halls, and staff amenity buildings
  • • Laboratory and operational-support buildings
  • • Site layout and modular building-configuration planning
  • • Weathering steel structural systems
  • • Insulated wall and roof systems
  • • Factory manufacturing and delivery coordination
  • • Customized electrical, plumbing, insulation, and air-conditioning provisions
  • • Optional on-site installation guidance, subject to project scale, confirmed scope, and client coverage of related service costs

DXH Container's modular building solutions can be configured according to workforce requirements, site conditions, building functions, room layouts, local technical requirements, and operational needs.

Request a Modular Mining Camp Proposal

Planning a mining camp, construction-site dormitory, concrete batching facility, or remote project office?

DXH Container provides customized modular building solutions for worker accommodation, site offices, canteens, laboratories, and supporting camp facilities.

Send us your site plan, quantity of buildings, room layout, technical requirements, delivery schedule, and project budget to request a modular camp proposal.

Frequently Asked Questions

Can DXH Container Customize a Mining Camp Layout for a Specific Site?

Yes. Modular mining camp layouts can be customized according to workforce requirements, available land, room configuration, functional zones, local conditions, utility planning, and project operational needs.

Are Single-story and Two-story Modular Dormitories Available?

Yes. The Indonesia project includes both single-story and two-story dormitory configurations. The appropriate building layout depends on site area, accommodation demand, local regulations, access requirements, and the client’s long-term operational plan.

Can Modular Buildings Be Adapted for Different Climate and Insulation Requirements?

Yes. DXH Container can configure insulation systems, wall and roof panels, electrical arrangements, plumbing, doors, windows, ventilation, and air-conditioning provisions according to the project location and operating requirements. Final specifications should be confirmed during the technical design stage.

What Information is Required to Request a Modular Mining Camp Quotation?

To prepare a preliminary proposal, DXH Container needs the required number of buildings, occupants, site location, room layout, building functions, local technical requirements, site plan or available land area, delivery schedule, and target budget.

prev
Military Container Accommodation Project for the Polish Army
recommended for you
Get in touch with us
WhatsApp
WeChat
Add:

Xunqing Rd No.639, Taoyuan Town, Wujiang District, Suzhou City, 

Jiangsu Province, China

DXH Container House as a professional prefabricated container house manufacturer which provides prefabricated houses and container houses and custom service.
Monday - Sunday: 24*7customer service
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect